Software Developer (Schedule/Construction Schedule Data) – Frankfurt & Remote
Westhouse is a leading recruitment company specializing in the placement of highly qualified specialists across the IT lifecycle and engineering sectors. We are currently seeking a talented Software Developer to join one of our esteemed clients.
Framework Information
- Reference: 180184
- Start: 01 October 2026
- Duration: 01 October 2026 - 31 December 2026
- Location: Frankfurt & Remote
- Work Scope: Part-time (38 PT)
- Languages: German
Your Qualifications
- (Must) 3 years of experience in developing integration or interface solutions between applications (technology-agnostic, not tied to a specific framework).
- (Must) 3 years of experience in implementing rule-based filter/routing logic for targeted processing and forwarding of data streams.
- (Must) 3 years of experience in connecting interfaces (e.g., REST/HTTP, messaging, file-based) and processing structured data formats (e.g., XML, JSON).
- (Must) 3 years of experience in developing automated tests and ensuring traceability and data quality.
- (Should) Experience in the railway, mobility, or infrastructure environment, ideally related to schedule/construction schedule data from at least 2 projects.
- (Should) Experience with multiple integration approaches or technologies (e.g., messaging brokers, event-driven or API-based integration), without being tied to a specific framework from at least 2 projects.
- (Should) Experience in an agile environment with verifiable certification as a Scrum Master, Agile Coach, or Product Owner.
Your Tasks
- Implement the construction schedule throttle, including the rule-based filter logic for targeted forwarding of the required construction schedules.
- Develop and connect the interfaces between the two applications (technology-agnostic, suitable for the chosen solution design).
- Implement the technical filter criteria into traceable, testable processing logic, as well as error and exception handling.
- Create automated tests and provide support during commissioning and production readiness.
- Coordinate closely with architecture, operations, and the specialist department to ensure stability and data quality.
Interested?
Apply online using the form below. Please note that only applications matching the job profile will be considered.
Your Contact Person
Sven Schäfer
P: +49-21-120053120
Work locationFrankfurt & Remote, Switzerland